News
The Prolyte 12m x 10m MPT Roof structure will be hosting the Aylesbury Concert Band this Saturday at Vale Park, Aylesbury. IPS will be supplying the complete technical production infrastructure, including staging, lighting, sound and power for the stage and concessions. More information about the event can be found here.
The large 16m x 14m Prolyte CLT XL Roof Stage system has been in action for the second year running for the Glamis Castle Proms. The event took place last weekend, and was a huge success, featuring a performance from the Royal Scottish National Orchestra, and a spectacular fireworks display.
IPS now has the new Pioneer CDJ2000 CD Players, and the Pioneer DJM2000 Mixer in stock. These flagship products are described by Pioneer as a “new professional player for the digital age”. These much sought after CD players are making their way onto increasing numbers of riders- helped by their abilty to playback directly from a USB memory stick or portable harddrive.
IPS are proud to have supplied various structures for the 2012 Milton Keynes International Festival, including a Layher Front of House Position and Projection Tower, a Layher Entrance Gantry, along with various sized Stages, Lighting & Viewing Platforms. With the sun finally making an appearance onsite, the Layher entrance gantry has been installed in one part of Campbell Park, and then moved to a second location to promote different events on the site.
Everything has been really busy here at IPS over the last few weeks. We have been rushed off our feet working on loads of different event sites for various different clients, and supplied hundreds and hundreds of staging decks all over the country. We have even run out of staging a couple of times, with over a thousand staging modules out on hire over the last few weekends. From the Milton Keynes Bowl to Hyde Park to Skegness and Luton we really have been all over the place!